shut-down time

in analysis
https://doi.org/10.1351/goldbook.S05651
The time interval between production of the last result of an instrument and @S05650@.
Source:
PAC, 1989, 61, 1657. (Nomenclature for automated and mechanised analysis (Recommendations 1989)) on page 1664 [Terms] [Paper]